After inspection and a detailed review of potential options two possible solutions were determined as being feasible, cost-effective and meeting the environmental concerns during installation: CIPP lining and spiral-wound lining. The detailed works included: Combined CCTV, sonar and laser inspection of the entire length of sewer under investigation Site visits and investigation of collected information for detailed condition assessment Data management and flow control of the network Detailed rehabilitation option evaluation and alternative analysis based on assessment evaluation and potential high vertical loading due to overlying stormwater culvert Project management, specification development for CIPP & spiral lining.